Flood Mitigation Assistance Program
The Flood Mitigation Assistance Program is funded by FEMA and administered through a partnership with the Florida Division of Emergency Management (FDEM). FDEM has the authority and responsibility for developing and maintaining a State Hazard Mitigation Plan, reviewing Flood Mitigation Assistance Program subapplications, recommending technically feasible and cost-effective subapplications to FEMA and providing pass-thru funding for FEMA-approved and awarded project grants to eligible subapplicants.
Notice of Interest Period Begins 07/13/2026!
In anticipation of an open application period for the Flood Mitigation Assistance (FMA) Programs, the Florida Division of Emergency Management (FDEM) Mitigation Bureau is requiring the submission of the attached Notice of Interest (NOI) form.
All prospective subapplicants interested in submitting a FMA subapplication must complete the NOI form and submit it to the Non-Disaster Programs email at
non-disasterprograms@em.myflorida.com no later than 5:00 p.m. EDT on August 14, 2026.
NOI forms may be submitted as soon as they are completed. Forms will be reviewed in the order they are received. The purpose of the NOI form is to help determine potential project eligibility and provide early feedback on proposed projects, which may help reduce review time during the formal subapplication process. Submitting the NOI as early as possible will also provide subapplicants with additional time to address any issues and develop a complete, competitive subapplication.
Additional information regarding the FMA application period will be provided following FEMA's release of the FMA Notice of Funding Opportunity (NOFO).
Notice of Interest
FY 2026 Notice of Interest Form
- FDEM FY 2024 Flood Mitigation Assistance Application Period Announcement
- FY 2024 FMA Notice of Funding Opportunity (NOFO) Amendment
- FY 2024 FMA Notice of Funding Opportunity Fact Sheet
- FEMA GO Registration Guidance
- FEMA GO Startup Guide
- FEMA GO Subapplication Development Guide
- FY 2022 FMA and BRIC Statewide Webinar Presentation
- FY 2022 FMA and BRIC Webinar Minutes
- FEMA GO Plan Subapplication
- FEMA GO Project Scoping Subapplication
- FEMA GO Project Subapplication
- FMA HMA Cost Estimation Webinar Presentation
Duplication of Benefits Disclosure
FEMA Model Statement of Assurances for Property Acquisition Projects
Minimum Programmatic Subapplication Requirements for Property Acquisition Projects
Notice of Voluntary Interest - Sample - Single Site Version
Eligible Subapplicants are:
- State Agencies
- Federally-Recognized Tribes
- Local Governments/Communities
- Federally-recognized Native American Tribal Governments
Local governments may include non-federally recognized tribes or, consistent with the definition of local government in 42 U.S.C. § 5122(8), may include any tribe, authorized tribal organization, or Alaska Native village or organization that is not federally recognized according to 25 U.S.C. § 479(a) et seq.
Owners of structures, residential or non-residential, that have been previously flooded and desire to have their structure mitigated should consult with their local or Native American Tribal government about submitting an application on their behalf for grant funds. Applications must be submitted by an eligible subapplicant.
Eligible Project Activities:
Eligible mitigation projects include:
- Property Acquisition and Structure Demolition or Relocation
- Structure Elevation
- Mitigation Reconstruction
- Dry Floodproofing
- Localized/Non-localized Flood Control Projects
- Structural Retrofitting and Non-structural Retrofitting of Existing Buildings and Facilities
- Infrastructure Retrofit
- Soil Stabilization
- Community Flood Mitigation Projects
- Project Scoping
- Flood Mitigation Plans
The activities above, although eligible, must also meet the following minimum criteria in order to be considered for funding:
- Be cost-effective
A project must be cost-effective and substantially reduce the risk of future damage, hardship, loss or suffering resulting from a major disaster. This requirement is satisfied by performing an analysis to determine whether the benefits to be gained are at least equal to or greater than the cost of the project. - Be technically feasible
The project must use flood resistant design and construction methods and flood resistant materials that are accepted by the design and construction industry, as well as the Federal Emergency Management Agency. Also, a clear description of the proposed methods should be provided in the application's scope of work. - Located in or benefits an NFIP-compliant community
An eligible project must be physically located in a participating NFIP community that is not on probation, suspended or withdrawn from the NFIP, and the project must benefit such a community directly by reducing future flood damages. - Conforms to the State's Administrative Plan
All subapplicants must have a FEMA-approved and locally adopted mitigation plan by the application deadline and at the time of obligation of grant funds. - Complies with environmental laws, regulations and executive orders. Comply with Executive Order 11988 (Title 44, CFR, Part 9 - Floodplain Management and Protection of Wetlands), Environmental Considerations and the National Environmental Policy Act [NEPA] (Title 44, CFR , Part 10).
- Be in conformance with the minimum floodplain management regulations of the NFIP (Title 44, CFR, Sections 59 and 60.3) and the local government's Community Rating System Program, if applicable.
The traditional FEMA-approved software-based BCA Flood Modules to determine the cost effectiveness of a project must be used. Subapplicants must use a FEMA approved methodology to perform a BCA. Only project subapplications that demonstrate cost-effectiveness through a benefit cost ratio of 1.0 or greater will be considered. The BCA must be attached to the subapplicant's application. The FEMA approved BCA Toolkit, which includes the Flood Modules, may be downloaded at no cost at https://www.fema.gov/benefit-cost-analysis. The BCA Helpline may be contacted by telephone (855-540-6744) or via e-mail (bchelpline@fema.dhs.gov).
As appropriated by the Consolidated Appropriations Act, the Flood Mitigation Assistance (FMA) Grant Program provides resources to assist states, tribal governments, territories and local communities in their efforts to reduce or eliminate the risk of repetitive flood damage to buildings and structures insurable under the National Flood Insurance Program (NFIP) as authorized by the National Flood Insurance Act of 1968, as amended.
Applicants and Subapplicants must have a FEMA approved mitigation plan as of the application deadline in order to apply for mitigation projects in accordance with Title 44 CFR Part 201.
Cost-Share Requirements
|
Programs |
Mitigation Activity |
|
FMA - insured properties and planning |
75/25 |
|
FMA - repetitive loss property
|
90/10 |
|
FMA - severe repetitive loss property
|
100/0 |
FEMA has developed resources to assist subapplicants with project and planning subapplications. The resources can be found on the Hazard Mitigation Assistance Grants web page.
Publications and tools for the FMA program can be found in the links below:
State of Florida
Division of Emergency Management
Flood Mitigation Assistance Program
2489 Shumard Oak Boulevard
Tallahassee, Florida 32311